132. Project on Ecological Environment Modification and Protection of Nanyi Resorvior,
I. Project, construction scale and location: The content of the project is to implement the pollution treatment of the upper reach of Nanyi Reservior, the comprehensive improvement of surrounding villages and rurual environment, the water ecological restoration and proteciton, on-water garbabe collection of the reservior area, etc.項目選址漳州市南靖縣奎洋鎮。
II. Construction reasons and conditions: This can be used as the second water source for
III. Preliminary work of the project: Relevant planning works have been carried out.
IV. Project total investment:580 million RMBV. Project economic and efficiency analysis: This can be used as the second water source for
VI. Project liaison unit: Nanjing County Water Conservancy Bureau Project contact: Huang Shengyang
Tel:1390696***
Fax: 782***
E-mail:njslj7822626**[ta]**.com
I. Project, construction scale and location: The content of the project is to implement the Forest Ecological Landscape Promotion Project with the area of 15000 mu at the area of”two alongs and one around”( “along the Provincial Road Guanjiu Line, along the Shenhai Highway Conplex Line and around the County (
II. Construction reasons and conditions: The implementation of the Forest Ecological Landscape Promotion Project may greatly improve the peripheral ecological environment and strengthen the safety of the traffice along the road.
III. Preliminary work of the project: Year schedule plan has been finished.
IV. Project total investment:150 million RMBV. Project economic and efficiency analysis: Upon completion, the numerous people in the key area may save their costs in drinking water and crops irrigation of over RMB 3 million yuan. Furthure more, the beautiful ecological tourism is condusive to the development of ecological tourism, so as to bring the people there business opportunities.
VI. Project liaison unit: Pinghe County Forestry Bureau Project contact: Zhang Weimin
Tel:0596-521***
Fax:0596-526***
E-mail:ylgzwm**[ta]**.com
134. Leisure Agriculture and Rural Tourism Project of
I. Project, construction scale and location: The content of the project is to construct a 5000-mu ecological agriculture leisure base, the 600-mu Zhushi Lingguang ecological hamane scenic area, 900-mu Huangxikeng reservoir natural scenic area, 800-mu Baizhanglin ecological base and 170-mu Zhingqingyuan theme lesure scenic area. The location of the project is to be at
II. Construction reasons and conditions:
III. Preliminary work of the project: The premilinary works inculding project site selection, ground mapping, feasibility research, and planning & design have been completed.
IV. Project total investment:600 million RMBV. Project economic and efficiency analysis: Good investment prospects.
VI. Project liaison unit: Changtai County Banli Township People’s Government Contact Person: Xu Linbin
Tel:0596-827***
Fax:0596-827***
E-mail:ctblxrmzf**[ta]**.com
135. Mayangxi Ecological Leisure Agriculture Project of
I. Project, construction scale and location: The content of the project is to construct the landscape revetment, leisure sidewalks along the brook, water dropping landscape dam, grape planting sightseeing garden greenhouse, etc. The location of the project is to be at Mayangxi ecological tourism area,
II. Construction reasons and conditions: The content of the project is to build a holiday resort integating agricultural sightseeing and leisure tourism, based on Mayang Brook’s favorable ecological environment and tourism resources.
III. Preliminary work of the project: The preliminary works of the project have been completed.
IV. Project total investment:100 million RMBV. Project economic and efficiency analysis: Depends on specific project.
VI. Project liaison unit: Mayangxi Ecological Tourism Area of Changtai County Contact Person: Xiao Hongyong
Tel:0596-831***
Fax:0596-831***
E-mail:ctblxrmzf**[ta]**.com
136. Sewage Disposal Plant and Pipe Network Supporting Project of Changtai Lindun Industrial District
I. Project, construction scale and location: Build one sewage disposal works 5000 ton/day. Build sewage pipe network
II. Construction reasons and conditions: The construction of Sewage Disposal Plant and Pipe Network Supporting Project will improve the collecting rate and propossing rate of domestic wastewater in Lindun Industiral District, and avoid the domestic wastewater directly being discharged into the rivers which will pollute the water source and the environment.
III. Preliminary work of the project: In the process of preliminary work.
IV. Project total investment:60 million RMBV. Project economic and efficiency analysis: Good investment prospects.
VI. Project liaison unit: Lindun Industrial Area of Changtai County Contact Person: Liang Shifa
Tel:0596-826***
Fax:0596-826***
E-mail:ctldgyq**[ta]**.com
137. Sewage Disposal Plant and Pipe Network Supporting Project of
I. Project, construction scale and location: Build one sewage disposal works 5000 ton/day. Build sewage pipe network
II. Construction reasons and conditions: The construction of Sewage Disposal Plant and Pipe Network Supporting Project will improve the collecting rate and propossing rate of domestic wastewater in
III. Preliminary work of the project: In the process of preliminary work.
IV. Project total investment:60 million RMBV. Project economic and efficiency analysis: Good investment prospects.
VI. Project liaison unit:
Tel:0596-825***
Fax:0596-825***
E-mail:ctfydzb**[ta]**.com
138. Construction Project on
I. Project, construction scale and location: The content of the project is to construct the Jinshan Red Cone Forest Park (including a parking lot, tourist sidewalks, pavillions, etc.), specimen museum of animals and plants, the Jade Gallery, Wooden House Spring Villa, etc. The location of the project is to be at Jinshan Red Cone Forest Park of Hua’an County.
II. Construction reasons and conditions: Hua’an Jinshan Red Cone Forest Park, with the area of 3000 mu, is the largest red cone forest protection base of
III. Preliminary work of the project: The pre-planing has been completed.
IV. Project total investment:80 million RMBV. Project economic and efficiency analysis: Annual tourists are 500,000 and revenue is 30 million RMB.
VI. Project liaison unit: Hua’an County Development and Reform Bureau Project contact: Tang Juewen
Tel:1360697***
Fax:0596-736***
E-mail:haxfgj**[ta]**.com
139. Hua’an Jade Geological Park Construction Project
I. Project, construction scale and location: The content of the project is to develop and construct Hua’an Jade Geological Park. The location of the project is to be along the lakebed of
II. Construction reasons and conditions: After thousands of years’ river erosion, the rare jade stones of Hua’an was created by the universe, with clear textur, gorgeous colors, in thousands of postures, which make it to be a treasure among all the are stones. The consturction of
III. Preliminary work of the project: In the process of preliminary planning.
IV. Project total investment:100 million RMBV. Project economic and efficiency analysis: Annual tourists are 500,000 and revenue is 30 million RMB.
VI. Project liaison unit: Hua’an County Development and Reform Bureau Project contact: Tang Juewen
Tel:1360697***
Fax:0596-736***
E-mail:haxfgj**[ta]**.com
140. Guanyinshan Park of Zhangzhou Development Zone
I. Project, construction scale and location: The content of the project is to build the mountanious park landscape, a
II. Construction reasons and conditions: Zhangzhou develpmnet zone is equiped with a convenient three-dimensional transportation system consists of the sea, the land and the air. It takes only 15 minutes for the sea bus to directly get to the center of
III. Preliminary work of the project: In the process of preliminary planning.
IV. Project total investment:500 million RMBV. Project economic and efficiency analysis: The annual visitor of the development zone is expected to be over 500,000, which may bring a large number of consumers.
VI. Project liaison unit: Economic Development Bureau of Zhangzhou Development Zone Project contact: Lin Lvfeng
Tel:1364608***
Fax:0596-685***
E-mail:lhzdb30307**[ta]**.com
Urban construction
141. Close Urban Ring Road of Zhangzhou
I. Project, construction scale and location: There are 7 projects to be implemented in downtown area of Zhangzhou, including commencement of North Ring Road broadening and modification and implementation of
II. Construction reasons and conditions: Closure of ring road network enables vehicles accessing downtown area to pass through the city directly via ring roads, reducing large vehicles and transit vehicles entering main trunk roads of downtown area. Besides, it also facilitates citizens to realize rapid passing through via ring road network. Implementation of the project is beneficial for improving urban traffice environment and alleviating urban traffic jam.
III. Preliminary work of the project: Construction of South Ring Road (
IV. Project total investment:21.26 billion RMBV. Project contact enterprise: Zhangzhou Development and Reform Bureau
Contact: Zhang Guorong
Tel:0596-202***
Fax:0596-202***
E-mail:fjzztzk**[ta]**.com
142. Overpass Treatment at Some Intersections in Downtown Area of Zhangzhou (Overpass Construction)
I. Project, construction scale and location: To build overpasses for
II. Construction reasons and conditions: After overpass treatment, some intersections form rapid ring road partially to improve traffice capacity and efficiency and to alleviate traffic pressure.
III. Preliminary work of the project: In the process of preliminary planning.
IV. Project total investment:500 million RMBV. Project contact enterprise: Zhangzhou Development and Reform Bureau
Contact: Zhang Guorong
Tel:0596-202***
Fax:0596-202***
E-mail:fjzztzk**[ta]**.com
143. Yuanshan Public Transportation Hub in Downtown Area of Zhangzhou
I. Project, construction scale and location: To build Yuanshan Public Transportation Hub integrating public transportation hub, parking lot, energy supplement, maintenance and repair, and office management. The project, covering about
II. Construction reasons and conditions: There is no official public transportation hub in downtown area of Zhangzhou currently. With further growth of urban public transportation routes and mileages, it is in urgent need to build public transportation hub to reduce interchange distance and time among various transportation modes, to facilitate citizen traveling, and to serve urban production and life.
III. Preliminary work of the project: In the process of preliminary planning.
IV. Project total investment:200 million RMBV. Project contact enterprise: Zhangzhou Development and Reform Bureau
Contact: Zhang Guorong
Tel:0596-202***
Fax:0596-202***
E-mail:fjzztzk**[ta]**.com
144. Build Charging Piles in Downtown Area of Zhangzhou
I. Project, construction scale and location: To provide 11,000 dedicated charging piles in urban area and to add 6 sets of urban public charging stations and 1,100 scattered public charging piles. The project is located in the center area of
II. Construction reasons and conditions: There are a few charging piles at public transportation terminal stations in downtown area. With popularizing of electric vehicles, it is urgent to build charging piles.
III. Preliminary work of the project: In the process of preliminary planning.
IV. Project total investment:100 million RMBV. Project contact enterprise: Zhangzhou Development and Reform Bureau
Contact: Zhang Guorong
Tel:0596-202***
Fax:0596-202***
E-mail:fjzztzk**[ta]**.com
145. Parking System (Parking Meter) within Urban Border Line of Zhangzhou
I. Project, construction scale and location: To provide 13,000 rod-type parking meter in downtown area. With the help of background service software, foreground operation system software, mobile apps and mobile communication service, swiping card payment service and various management functions for parking are realized. The project locates in downtown area.
II. Construction reasons and conditions: Providing parking system is able to improve service efficiency and turnover rate of roadside parking, alleviating parking issues in urban area.
III. Preliminary work of the project: In the process of preliminary planning.
IV. Project total investment:50 million RMBV. Project contact enterprise: Zhangzhou Development and Reform Bureau
Contact: Zhang Guorong
Tel:0596-202***
Fax:0596-202***
E-mail:fjzztzk**[ta]**.com
146. Mazhou Sewage Treatment Plant in High-tech District of Zhangzhou
I. Project, construction scale and location: To build medium-sized sewage treatment plant with outlet water index up to Standard A of Level I stipulated in national Discharge Standard of Pollutants for Municipal Wastewater Treatment Plant. The project, covering 3.3 hectares, locates in northeast of Yuanshan Xincheng Planning Area in High-tech District of Zhangzhou. II. Construction reasons and conditions: As an environmental protection engineering, the project is benefitial for reducing discharge of harmful substance in sewage and alleviating impact of sewage discharge on water quality of rivers after its construction and operation.
III. Preliminary work of the project: Project address has been determined; survey, design, compilation of water and soil conservation proposal, and environmental impact assessment report are onging.
IV. Project total investment:200 million RMBV. Project contact enterprise: Zhangzhou Development and Reform Bureau
Contact: Zhang Guorong
Tel:0596-202***
Fax:0596-202***
E-mail:fjzztzk**[ta]**.com
147.The Second Potable Water Source in Urban Area of Zhangzhou
I. Project, construction scale and location: To build water source protection project and pipeline network project, and to install
II. Construction reasons and conditions: For the sake of ensuring safety of urban water supply, it is extremely necessary to establish the second water source.
III. Preliminary work of the project: In the process of preliminary planning.
IV. Project total investment:1.3 billion RMBV. Project contact enterprise: Zhangzhou Development and Reform Bureau
Contact: Zhang Guorong
Tel:0596-202***
Fax:0596-202***
E-mail:fjzztzk**[ta]**.com
148. Build Urban Underground Comprehensive Pipe Rack in Longwen District
I. Project, construction scale and location: Plan to build 3 types of comprehensive pipe racks, including pipe racks with one chamber (
II. Construction reasons and conditions: Accelerate construction of urban underground comprehensive pipe rack, coordinate planning, construction and management of various municipal pipelines, and solve issues such as repeated pavement excavation, dense overhead network and frequent occurrence of pipeline accidents. III. Preliminary work of the project: In the process of preliminary planning.
IV. Project total investment:3.5 billion RMBV. Project contact enterprise: Zhangzhou Development and Reform Bureau
Contact: Zhang Guorong
Tel:0596-202***
Fax:0596-202***
E-mail:fjzztzk**[ta]**.com
149. Wushi Complex Project
I. Project, construction scale and location: Combining commercial with residential land, build Wushi complex integrating finance, trade and business, dwelling, recreation and entertainment. With 140mu of actual land area, the project, covering 187mu, is in
II. Construction reasons and conditions: After its completion, the project is benefitial for improving urban taste, revealing its charm, and serving not only Jinfeng Economic Development Zone but also
III. Preliminary work of the project: The land has been submitted for approval and is ready for transferring.
IV. Project total investment:1 billion RMBV. Project contact enterprise: Administrative Committee of Jinfeng Economic Development Zone of Zhangzhou
Contact: Lin Tingfeng
Tel:1385050***
150. The Third Water Plant of Zhangzhou
I. Project, construction scale and location: The third water plant features 300, 000t of long-term daily water supply capacity and 100,000t of phase I designed daily water supply capacity. The project locates at the west of north
II. Construction reasons and conditions: The conflict of urban water supply is increasingly outstanding due to the rapid expansion of urban construction of Longwen District towards east and north, the introduction of large projects such as Sedrin Beer and Liandong U Valley in Lantian Economic Development Zone, the operation of projects such as Olympic Sports Center of Yuanshan Xincheng and Zhangzhou Railway Station, and settling down of PIEN TZE HUANG of Jingcheng.
III. Preliminary work of the project: In the process of preliminary planning.
IV. Project total investment:900 million RMBV. Project contact enterprise: Zhangzhou Development and Reform Bureau
Contact: Zhang Guorong
Tel:0596-202***
Fax:0596-202***
E-mail:fjzztzk**[ta]**.com
151. PCB CNC Drilling Machine Manufacturing Base in Zhangzhou
I. Project, construction scale and location: 800 sets of PCB (printed circuit board) CNC drilling machine is to be produced annually. Major planning includes construction of design and R &D area, machine production area, quality inspection area, product exhibition area, packing, logistics & storage area and maintenance service area. The project is planned to cover 60mu, with
II. Construction reasons and conditions: Combine metal machinery manufacturing industry and electronic information technology of Zhangzhou, and create manufacturing base for high-end six-axis CNC drilling machine and its accessories suitable for multiple types of PCB drillings.
III. Preliminary work of the project: In the process of planning.
IV. Project total investment:200 million RMBV. Project contact enterprise:
Contact: Lv Mingxuan
Tel:1775017***
E-mail:gxqzsfwzx**[ta]**.com
152.
I. Project, construction scale and location:
III. Preliminary work of the project: In the process of preliminary planning.
IV. Project total investment:250 million RMBV. Project contact enterprise: Zhangzhou Development and Reform Bureau
Contact: Zhang Guorong
Tel:0596-202***
Fax:0596-202***
E-mail:fjzztzk**[ta]**.com
153.
I. Project, construction scale and location: The project is planned to utilize Wufeng Farm of
II. Construction reasons and conditions: It is necessary to build a botanical garden in downtown area for the sake of protecting natural resources, maintaining and promoting ecological balance, improving urban taste and combing regional characteristics of Zhangzhou.
III. Preliminary work of the project: In the process of preliminary planning IV. Project total investment:170 million RMBV. Project contact enterprise: Zhangzhou Development and Reform Bureau
Contact: Zhang Guorong
Tel:0596-202***
Fax:0596-202***
E-mail:fjzztzk**[ta]**.com
154.
I. Project, construction scale and location: The project, planned to cover 60mu of land, mainly builds linquan secluded area, tingquan flowering shrubs area, bathing beach area, colourful water area, spring-free therapy area, changjing ocean spa area and public service area. The project is planned to cover 60mu of land. Project location is in Zhangzhou High-tech Zone.
II. Construction reasons and conditions: Yuanshan New Area of Zhangzhou is a crucial area for Zhangzhou to declare “
III. Preliminary work of the project: In the process of planning.
IV. Project total investment:70 million RMBV. Project contact enterprise:
Contact: Lv Mingxuan
Tel:1775017***
E-mail:gxqzsfwzx**[ta]**.com
155. Build Parking Facilities in Longwen District
I. Project, construction scale and location: To build 2 Bihu parking lots; parking lot of Longwen administrative service center; Jiushijiu Bay parking lot; parking lot on the east of urban area; parking lot of People’s Square; tower-type machinery garage on the south of Lianfenghaoyuan. The project is located in Longwen area.
II. Construction reasons and conditions: Improve parking facilities.
III. Preliminary work of the project: In the process of preliminary planning IV. Project total investment:60 million RMBV. Project contact enterprise: Zhangzhou Development and Reform Bureau
Contact: Zhang Guorong
Tel:0596-202***
Fax:0596-202***
E-mail:fjzztzk**[ta]**.com
156. Construction and Modification Project of Underground Comprehensive Pipe Rack in Jinfeng Econmic Development Zone
I. Project, construction scale and location: To construct and modify roads and underground comprehensive pipe rack for stormwater & sewage pipes, power, communication, city water and gas pipeline in economic development zone. The project locates in Jinfeng Economic Development Zone.
II. Construction reasons and conditions: To avoid repeated removal and construction and to utilize underground space reasonably and effectively.
III. Preliminary work of the project: In the process of preliminary planning IV. Project total investment:600 million RMBV. Project contact enterprise: Zhangzhou Development and Reform Bureau
Contact: Zhang Guorong
Tel:0596-202***
Fax:0596-202***
E-mail:fjzztzk**[ta]**.com
157. Qixian
I. Project, construction scale and location: To building five functional areas (camping activity area, forest dwelling area, lake view central area, cultural & entertainment area, food & leisure area and reception management area) and auxiliary facilities. The project locates on
II. Construction reasons and conditions: Qixian Lake Forest Dwelling locates at the southeast side of Tianbaoshan Forest Park, a provincial level
III. Preliminary work of the project: Controllable specific planning has been completed.
IV. Project total investment:1 billion RMBV. Project contact enterprise: Tianbao Town Government of Xiangcheng District
Contact: Zhan Qingxian
Tel:0596-254***
158. Sewage Treatment Plant and Pipe Network Auxiliary Works in Economic Development Zone of
I. Project, construction scale and location: With 50,000t/day of designed treatment capacity, pump station and sewage pipe network (
II. Construction reasons and conditions: With rapid development of urban economy and construction in recent years, domestic sewage has been polluted seriously, with its volume increasing rapidly. Sewage treatment plant is not only able to solve domestic sewage issue in villages and towns around urban area and county thoroughly but also able to improve overall level of urban comprehensive environmental treatment, creating beautiful and neat environment and protecting water source.
III. Preliminary work of the project: In the process of planning and design.
IV. Project total investment:300million RMBV. Project contact enterprise: Zhangzhou Development and Reform Bureau
Contact: Zhang Guorong
Tel:0596-202***
Fax:0596-202***
E-mail:fjzztzk**[ta]**.com
159. Modification and Upgrading of
I. Project, construction scale and location: To improve and upgrade
II. Construction reasons and conditions: To improve living environment and quality III. Preliminary work of the project: In the process of preliminary planning IV. Project total investment:50 million RMBV. Project contact enterprise: Zhangzhou Development and Reform Bureau
Contact: Zhang Guorong
Tel:0596-202***
Fax:0596-202***
E-mail:fjzztzk**[ta]**.com
160. Hotel-type Nursing Home in Downtown Area of Zhangz***
I. Project, construction scale and location: Construction of community nursing home includes housing, equipment, field and basic device. The project locates on streets and in villages and towns of central urban area of Zhangzhou.
II. Construction reasons and conditions: With increasing pressure of aging of population and weakening pension service of traditional family, the aged, the advanced aged in particular, demands for more and more social welfare and service. Pension function is about to rely more on the society and launching of community service.
III. Preliminary work of the project: In the process of preliminary planning IV. Project total investment:50 million RMBV. Project contact enterprise: Zhangzhou Development and Reform Bureau
Contact: Zhang Guorong
Tel:0596-202***
Fax:0596-202***
E-mail:fjzztzk**[ta]**.com